Deployment: SJ0609

Deployment: 
SJ0609
Chief Scientist: 
Jonathan P. Zehr (University of California-Santa Cruz, UCSC)
Synonyms: 
Platform Type:
 vessel
Start Date: 
2006-06-18
End Date: 
2006-07-31
Location: 
Tropical North Atlantic
Description

Leg 1 of the cruise began in Ft. Pierce FL with a rapid transit to Bridgetown,

Barbados and two hydrostations (001-002) en route. Leg 2 extended from Barbados

to Mindelo, Cape Verde, with nine hydrostations (003-010, 012). Leg 3 included

a run south to the equator, then northwestward to Barbados with eleven hydrostations (013-023).